If you're in the process of or planning to build a new home, we ask you to contact us immediately. Installing your new electric service takes time, and you may even need to meet with our engineering department on site to discuss specifics. Doing so can help advise the new home builder with budgeting costs.
So that we may better serve you with your electrical needs, when requesting electric service please provide vital information such as owner's name, mailing address, property location including legal description (subdivision, block/lot number), physical address and electrician's name.
To see a temporary service spec sheet (required by HWE) that will assist you to do the work on your own, or your builder, click here.
In addition, the following information will be required:
- HWE will figure costs of primary and/or secondary and prepare an estimate for new service after meeting in the field with an engineering representative.
- Upon receiving the signed application and fees, HWE also needs a copy of the building permit and any signed right-of-way easements that may be required.
- Line construction and/or temporary construction will be scheduled upon receipt of the contracts, fees, building permit and easements.
- Meter location must be approved by HWE before meter socket will be issued or permanent service connected.
Note: In order to view and print the temporary service spec sheet, you need to have the Adobe Acrobat Reader software installed on your computer. If you don't already have Acrobat, click below for download instructions:
Click here to download Adobe Acrobat Reader.
|